95%

Industrial units availability

56

WAGABOX® units worldwide

20 under construction and 36 operational

504k

tons

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Project WW - Region
Project WW - Status
Project WW - WAGABOX® Model
Saint-Laurent-des-Hommes

Saint-Laurent-des-Hommes (SMD3)

Operational

it

WAGABOX® Model

250 scfm

Commissioning

March 2026

Installed capacity

58,006 MMBtu/year

Distance to pipeline

0.06 miles

Landfill gas composition

CH4

46,00%

N2

17,50%

Saint-Maximin (Suez)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

June 2017

Installed capacity

85,304 MMBtu/year

Distance to pipeline

0.7 miles

Landfill gas composition

CH4

34,00%

N2

28,30%

Image-WB-Saint-Palais-720x540

Saint-Palais (Veolia)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

November 2018

Installed capacity

68,243 MMBtu/year

Distance to pipeline

1 mile

Landfill gas composition

CH4

44,50%

N2

17,80%

Sainte-Marie-Kerque

Sainte-Marie-Kerque (OPALE / Séché)

Operational

fr

WAGABOX® Model

500 scfm

Commissioning

December 2024

Installed capacity

119,425 MMBtu/year

Distance to pipeline

-

Landfill gas composition

CH4

38,40%

N2

27,70%

under-construction

SECCRA (SECCRA)

Under construction

it

WAGABOX® Model

-

Commissioning

2026

Installed capacity

228,614 MMBtu/ year

Distance to pipeline

1 mile

Landfill gas composition

CH4

-

N2

-

Septèmes-les-Vallons

Septèmes-les-Vallons (Veolia)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

June 2024

Installed capacity

85,304 MMBtu/year

Distance to pipeline

1.1 miles

Landfill gas composition

CH4

41,10%

N2

20,20%

under-construction

Short Mountain (Lane County)

Under construction

usa

WAGABOX® Model

2000 scfm

Commissioning

Q4-2027

Installed capacity

406,045 MMBtu/year

Distance to pipeline

2.2 miles

Landfill gas composition

CH4

-

N2

-

Winnebago (Air Liquide)

Operational

usa

WAGABOX® Model

-

Commissioning

October 2023

Installed capacity

1 126 006 MMBtu/year

Distance to pipeline

-

Landfill gas composition

CH4

-

N2

-

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.