Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

Industrial units availability

56

WAGABOX® units worldwide

20 under construction and 36 operational

504k

tons

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Project WW - Region
Project WW - Status
Project WW - WAGABOX® Model
under-construction

Aix-en-Provence (Aix-Marseille-Provence Métropole)

Under construction

fr

WAGABOX® Model

1000 scfm

Commissioning

March 2027

Installed capacity

187,668 MMBtu/year

Distance to pipeline

0.7 miles

Landfill gas composition

CH4

-

N2

-

Beaumont (OCI Global)

Under construction

usa

WAGABOX® Model

2000 scfm

Commissioning

2026

Installed capacity

406,045 MMBtu/year

Distance to pipeline

0.05 miles

Landfill gas composition

CH4

-

N2

-

Bena (Kern County)

Under construction

usa

WAGABOX® Model

3000 scfm

Commissioning

Q1-2027

Installed capacity

545,943 MMBtu/year

Distance to pipeline

2.2 miles

Landfill gas composition

CH4

-

N2

-

Image-WB-Blaringhem-720x324

Blaringhem (Baudelet)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

September 2020

Installed capacity

85,304 MMBtu/year

Distance to pipeline

0.4 miles

Landfill gas composition

CH4

39,30%

N2

26,60%

Can Mata (PreZero)

Operational

es

WAGABOX® Model

1500 scfm

Commissioning

June 2023

Installed capacity

272,971 MMBtu/year

Distance to pipeline

2.5 miles

Landfill gas composition

CH4

47,10%

N2

18,00%

Cape May (CMCMUA)

Under construction

usa

WAGABOX® Model

1000 scfm

Commissioning

Q1-2028

Installed capacity

204,729 MMBtu/year

Distance to pipeline

1 mile

Landfill gas composition

CH4

-

N2

-

Chatuzange

Chatuzange-le-Goubet (Veolia)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

November 2024

Installed capacity

85,304 MMBtu/year

Distance to pipeline

3.2 miles

Landfill gas composition

CH4

44,50%

N2

17,60%

Chemung (Casella)

Operational

usa

WAGABOX® Model

3000 scfm

Commissioning

Q3-2025

Installed capacity

610,773 MMBtu/year

Distance to pipeline

4.5 miles

Landfill gas composition

CH4

44,70%

N2

19,60%

Image-WB-Chevilly-720x477

Chevilly (Suez)

Operational

ca

WAGABOX® Model

250 scfm

Commissioning

December 2018

Installed capacity

51,182 MMBtu/year

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

44,30%

N2

20,90%

20191213_160706-720x540

Inzinzac-Lochrist (Lorient Agg)

Operational

fr

WAGABOX® Model

250 scfm

Commissioning

November 2019

Installed capacity

51,182 MMBtu/year

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

46,90%

N2

13,80%

chicoutimi

Chicoutimi (Matrec-GFL)

Operational

ca

WAGABOX® Model

375 scfm

Commissioning

December 2023

Installed capacity

85,304 MMBtu/year

Distance to pipeline

0.6 miles

Landfill gas composition

CH4

46,90%

N2

19,60%

1e20a971-54af-4fdc-a36b-1c192d93aad5-e1690302171362-720x391

Claye-Souilly (Veolia)

Operational

fr

WAGABOX® Model

2000 scfm

Commissioning

March 2022

Installed capacity

409,457 MMBtu/year

Distance to pipeline

13.5 miles

Landfill gas composition

CH4

41,40%

N2

20,30%

Clermont-Ferrand (Valtom)

Operational

fr

WAGABOX® Model

250 scfm

Commissioning

December 2024

Installed capacity

51,182 MMBtu/year

Distance to pipeline

0.4 miles

Landfill gas composition

CH4

47,40%

N2

13,00%

Cowansville (Régie de Brome-Missisquoi)

Operational

ca

WAGABOX® Model

750 scfm

Commissioning

July 2024

Installed capacity

102,364 MMBtu/year

Distance to pipeline

3.1 miles

Landfill gas composition

CH4

41,70%

N2

25,30%

under-construction

CTR Cogersa (Cogersa)

Under construction

es

WAGABOX® Model

1000 scfm

Commissioning

May 2028

Installed capacity

204,729 MMBtu/year

Distance to pipeline

0.6 miles

Landfill gas composition

CH4

-

N2

-

Cusset (Suez/Vichy communauté)

Operational

fr

WAGABOX® Model

375 scfm

Commissioning

October 2023

Installed capacity

85,304 MMBtu/year

Distance to pipeline

2.7 miles

Landfill gas composition

CH4

43,30%

N2

23,00%

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.