Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make renewable natural gas widely accessible.

95%

Industrial units availability

53

WAGABOX® units worldwide

20 under construction and 33 operational

1906 K

tons of

CO2 equivalent emissions avoided

674

GWh of

RNG injected in 2025

All of our projects

Project - Region
Project - Status
Project - Wagabox Model
Image_WB-Saint-Etienne-des-Gres

Saint-Etienne-des-Grès (Québec)

Under construction

ca

WAGABOX® Model

600

Commissioning

May 2023

Installed capacity

130 (GWh/year)

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

42-45%

O4

1-2%

H2S

0-50 ppmv

N4

10-22%

Test Brazil

Operational

br

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Test France

Operational

fr

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Test France 2

Operational

fr

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Test Italy

Operational

it

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Test Spain

Operational

es

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Test United Kingdom

Operational

uk

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

shared-image-1-1-720x540

Test USA

Operational

usa

WAGABOX® Model

600

Commissioning

Installed capacity

Distance to pipeline

Landfill gas composition

CH4

O4

H2S

N4

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.